Pleasanton Fireplace, November 2025
Very pleased with the broken marble materials the client chose. This took 2 days. The structures over the spans can get tricky. We’re awaiting the mantle.
Very pleased with the broken marble materials the client chose. This took 2 days. The structures over the spans can get tricky. We’re awaiting the mantle.
Used an oil rather than a stain and sealant. Power-washed, spot-sanded, recessed screws, puttied some cracks, applied stain.
Resurfaced Redwood Deck, Pacific Heights, SF, September, 2025 Read More »
Demolished two layers of linoleum and one layer of particle board. Installed backer and square tiles in a grid pattern. Older client wanted an older look.
Tile Concrete Backer And Floor, Roosmoore, Walnut Creek, August, 2025 Read More »