Montclair Kitchen Budget Renovation, November 2025
This involved a re-grout of the counter top and some touch-up paint.
Montclair Kitchen Budget Renovation, November 2025 Read More »
This involved a re-grout of the counter top and some touch-up paint.
Montclair Kitchen Budget Renovation, November 2025 Read More »
We do patches from dry rot and sun damage frequently. A decision was made on this north-facing panel, to use concrete board, and Durham’s. One porch pillar had to be replaced. It just needs sanding and paint by the client’s painter.
Portrero Hill Stair Panel, Lower Balustrade Rail Read More »
Used an oil rather than a stain and sealant. Power-washed, spot-sanded, recessed screws, puttied some cracks, applied stain.
Resurfaced Redwood Deck, Pacific Heights, SF, September, 2025 Read More »
Demolished two layers of linoleum and one layer of particle board. Installed backer and square tiles in a grid pattern. Older client wanted an older look.
Tile Concrete Backer And Floor, Roosmoore, Walnut Creek, August, 2025 Read More »