Oakland Crown Molding And Paint, September – December 2024
Oakland Crown Molding And Paint, September – December 2024 Read More »
This project was for backer and the installation of materials selected by the client, including a floating vanity. A decision was made not to demo the floor, but rather use acrylic thinset for the herringbone pattern.
Pretty conventional. Used Liquid Nails ‘Fuze It’ as adhesive. Snips for mosaic tile. It went quickly.
San Leandro Backsplash, And Drywall Repair, February, 2024 Read More »
This work consisted of a bunch of cosmetic and finish work. Best explained by photos.
San Francisco Restaurant (Market Street), May, 2023 Read More »
This was a straightforward job. Until I realized I had not checked the slope or fit of the tub. The tub was about 1″ too small for the footprint. After backer board is installed, the lip of the tub should abut the walls, and after a bed of mortar is put in (everywhere but that
SF Condo Tile Bath Surround And Floor, May, 2023 Read More »
These folks needed garbage bin enclosures that served a couple of purposes: 1) to keep strangers from putting waste in their bins, and 2) to keep the exterior of their duplex looking clean. They were on a budget and there was the additional challenge of two different sizes of rolling garbage bins (mobies). In the